Concept build by Rush Webworks. This is a demonstration site for a fictional business.

Covered decks·Timber patio covers·Pavilions

Outdoor rooms for the other nine months.

We design and build covered decks, timber patio covers, and pavilions for Portland yards. Built for October, not just July.

Portland·Beaverton·Lake Oswego·MilwaukieOR CCB #000000 placeholder

01·What we build

Four ways to stay out longer.

Every project starts at the back door and ends somewhere you will actually sit in November. Hover a card to open it.

Two wooden chairs on a cedar deck beside a wood-sided house, lit warm at dusk

01

Covered decks

A deck with a roof over the part you actually use.

  • Cedar, composite, or hardwood boards
  • Stairs, landings, and lighting wired in
  • A flashed, bolted ledger on every attached deck

Most land between $28k and $65k sample range

Ask about a covered deck

Looking up at a timber patio cover with a clear roof and round string lights

02

Timber patio covers

Fir beams over a clear or metal roof, so the light stays in and the rain stays out.

  • Clear polycarbonate or standing-seam metal
  • Gutters and downspouts planned from the start
  • Heaters, fans, and lights pre-wired

Most land between $18k and $45k sample range

Ask about a patio cover

A small timber-framed outdoor room glowing with warm lights under a cloudy evening sky

03

Pavilions

A freestanding room at the back of the yard, for the fire, the hot tub, or the long table.

  • Post and beam on poured footings
  • Open, half-walled, or screened
  • Sized to your yard and your permit

Most land between $24k and $70k sample range

Ask about a pavilion

Close view of weathered, split deck boards gone grey

04

Rebuilds

Soft boards and a wobbly rail usually mean the frame needs a look first. We tell you what can stay.

  • A structural check before any price
  • A new surface on a sound frame when it can stay
  • A full rebuild when it cannot

Every rebuild starts with a free site visit

Ask about a rebuild

Swipe for all four

02·Built for the rain

Every beam we set expects water.

It rains here most of the year, so every detail we build starts with one question: where does the water go?

  1. 01

    Flashing first

    The ledger, where a deck meets the house, is where rot starts. We flash it, tape the joists, and bolt it before a single board goes down.

  2. 02

    Hardware that outlasts the wood

    Stainless or hot-dip galvanized fasteners and hidden clips, so nothing rusts, streaks, or works loose.

  3. 03

    Room to dry

    Board gaps sized to the material and air under the frame, so the deck dries out between storms instead of staying damp all winter.

  4. 04

    A plan for runoff

    Every roof gets a pitch, a gutter, and a downspout that sends water somewhere on purpose, never onto your stairs.

03·Deck planner

Sketch it here. We price it in person.

Set the size, the height, the boards, and a roof. You get a drawing and a ballpark now, and a real price in writing after a free site visit.

The planner needs JavaScript to draw. Book a site visit below and we will sketch it with you in the yard.

Plan 01·16 × 12 ft raised deck
Isometric drawing of the deck you are planning
Rafter & Rain·Drawn to scaleNot for construction
Size
16 ft
12 ft
Height
Boards
Roof
Railing

Ballpark sample rates

$25,500 to $33,500

192 sq ft · composite boards · half cover · cable rail · stairs

Ballpark only, for planning. The site, access, permits, and lumber prices move the real number, which comes in writing after the site visit.

04·Kind words sample reviews

Still out there in February.

We used to give up on the back deck in October. Now it is where we eat most nights, rain or not, and the heater means the kids actually come outside.

Dana R.Sellwood·Covered deck

The site visit was the most useful hour of the whole project. They showed us which parts of the old frame could stay, and the price came in lower than we expected.

Marcus and PriyaBeaverton·Rebuild

Fir beams, a clear roof, a fan for August. It feels like a room, and we still get the light in February.

Helen T.Lake Oswego·Patio cover

A photo at the end of every day. When the rain came in the second week, the site was already tarped and nothing sat wet.

Joel K.Milwaukie·Pavilion

Our neighbors asked for their number before the stain was dry.

Ana M.Tigard·Covered deck

05·How a build goes

Five steps, all in writing.

  1. 01

    Site visit

    Free and in person. We measure, check the ledger and the drainage, and ask how you want to use the space.

  2. 02

    Drawing and price

    A scaled drawing and a written price within a week, with what is included and what is not.

  3. 03

    Permits

    We pull the permit when your project needs one and meet the inspector on site.

  4. 04

    The build

    One to three weeks on site for most decks and covers, with a photo update at the end of every day. sample

  5. 05

    Walkthrough

    We walk it with you, fix anything on the list, and leave a care guide for the boards and the roof.

Questions

What people ask at the site visit.

Do I need a permit?

Often, yes. Covered structures and most raised decks need one in Portland-area cities. We check at the site visit and take care of it when it is needed.

Can you build in the rainy season?

Yes. Framing goes on under tarps from October to May, and we plan concrete and stain around the dry spells.

Cedar or composite?

Cedar costs less up front and looks like the Northwest, but wants a fresh coat of stain every few years. Composite costs more and asks for a wash in spring. We bring both to the site visit.

Will a clear roof stay clear?

Needles and leaves land on every roof. We pitch clear roofs so the rain does most of the cleaning, and a hose does the rest a couple of times a year.

Do you take small repairs?

We take on rebuilds and resurfacing. For a single loose board or a stuck gate, we will point you to someone good.

06·Book a site visit

Let's walk the yard.

Tell us a little about the space. We reply within one business day to set a time. sample

What are we building?